Force Main Replacement Project

A “Force Main Replacement Project” is underway, which is boring for new pipe to replace old and deteriorated pipes. This is happening, beginning at Anchor Drive near the Plaza Building to
Lakeside Drive, Lakeside Drive to the Wastewater Treatment Plant and at the Airport Apron (underneath the runway). WHAT does this mean for you?
Most of this will happen without any disruption, however: The cart path on the south side of Anchor Drive near the four-way will be closed for two days, sometime between August 5 and 12. You will be directed around the section that is closed. One night between September 2 and 9th during the hours of 6 PM to Midnight, the four way stop will be shut down and traffic will be directed around the perimeter areas.
Thank you in advance for your cooperation while we improve your community.